Skip to main content

building air Monday, March 21

———- Forwarded message ———-
From: Tracy Erbeck <tracy@cs.washington.edu>
Date: Thu, Mar 17, 2011 at 1:14 PM
Subject: [cs-ugrads] building air Monday, March 21
To: cs-staff – Mailing List <cs-staff@cs.washington.edu>, faculty – Mailing List <faculty@cs.washington.edu>, cs-grads – Mailing List <cs-grads@cs.washington.edu>, cs-ugrads – Mailing List <cs-ugrads@cs.washington.edu>, visitors – Mailing List <visitors@cs.washington.edu>
Cc: Heidi Dlubac <hdlubac@cs.washington.edu>

The building fans will not be fully operational on Monday, March 21, from 7am to 1pm.  This means that it might get a little stuffy, but it should not be too uncomfortable.

 

I’ll be out of the office that day,  contact Heidi Dlubac if there are any issues (3.1495).

 

Tracy Erbeck

Facilities Manager, CSE, University of Washington

tracy@cs.washington.edu

206.543.9264 (office)

206.543.2969 (fax)

 

March 17, 2011